projects which included identification of project sites, preparation of feasibility studies and, when found feasible, the eventual detailed engineering design and construction supervision of these power plants. The firm's experience in power generation is highlighted by the completion of a feasibility study and preliminary engineering design of 300 MW/ 100 MW power generation projects for the electric cooperatives of the Ilocos region. In 1991 Awiai completed its first turnkey [Engineering, Operation & Maintenance, Project Management, Architecture, Information Technology, Equipment and Construction services provided] energy project with the commissioning of a 20Mw hydroelectric project in Canada. Currently Awiai is undergoing a turnkey award on a 36
MW hydroelectric project in Canada, and detailed engineering review on a 150Mw combined cycle project in Bangladesh.
View Featured Projects