The Tibag-Burgos provincial road list seven (7) barangays which are major sources of agriculture procedure to the poblacion. It covers about 20 kms of 9.00 meter wide asphalt roads with three (3) bridges.
Description of Services Provided :
AWIA's service included field surveys, soils investigations, engineering design and preparation of contract documents. There was a need to set up a complete soils laboratory at the job site